Win United was recently presented with an application where a 200 meter mine shaft that had deteriorated and was unable to provide water to the service vehicles. With the use of heavy duty layflat we provided a temporary solution to have the water supply reconnected until further shafts were drilled. This was manufactured and supplied with in 1 week.